← Back to map

Prospect 3

Jackson County, Oregon · EIA plant ID 3034 · Operator: PacifiCorp
HydroConventional HydroelectricBA: PACW
Nameplate7MWSummer 8 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor-0%!hydro units, summer MW
Heat rate—thermal plants only
First online1932

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2024GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20052010201520202025-0.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200124.337.0%—
20023553.2%—
200334.652.6%—
200438.358.2%—
200531.547.9%—
200642.164.0%—
200744.265.5%—
200841.160.7%—
200935.652.8%—
201035.352.4%—
201146.769.2%—
201237.555.5%—
201333.750.0%—
201435.953.3%—
201527.841.2%—
20163348.8%—
201740.860.5%—
201822.333.0%—
201923.635.0%—
20201725.2%—
202110.615.8%—
2022-0.2-0.3%—
2023-0.2-0.3%—
2024-0.2-0.3%—
2025-0.2-0.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY7.27.7Apr 1932Operating—coming soon

Owner / operator

Operator: PacifiCorp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PacifiCorp100.0%7 MW

Nearby plants

Within 80 km.
Prospect 232 MW7.8 km
Prospect 14 MW7.9 km
Prospect 41 MW7.9 km
Lost Creek49 MW22.1 km
OR Solar 2, LLC10 MW36.3 km
Eagle Point3 MW36.7 km