← Back to map

Tule RiverOut of service

Tulare County, California · EIA plant ID 289 · Operator: Tule Hydro LLC
HydroConventional HydroelectricCAISOBA: CISO
Nameplate8MWSummer 6 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online1914

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-101234GWh2001200320052007200920112013201520172019

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200115.527.7%—
200221.137.7%—
200324.143.0%—
200417.130.4%—
200527.949.8%—
200625.645.7%—
20079.717.3%—
200820.436.2%—
200917.831.8%—
201025.846.0%—
201126.747.5%—
201211.219.9%—
20135.59.8%—
20141.72.9%—
2015-2.4-4.3%—
201614.926.5%—
201700.0%—
201800.0%—
201900.0%—
202000.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY4.23.2Jan 1914Operating (Out of service)—coming soon
2Conventional HydroelectricHY4.23.2Jan 1914Operating (Out of service)—coming soon

Owner / operator

Operator: Tule Hydro LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tule Hydro LLC100.0%8 MW

Nearby plants

Within 80 km.
Lower Tule River3 MW7.9 km
Anode (Springville) BESS—21.9 km
Tulare Success Power Project1 MW22.7 km
Porterville Solar4 MW30.6 km
Porterville 6 and 73 MW30.8 km
South County Detention Center Solar1 MW34.7 km