← Back to map

Port Jefferson

Suffolk County, New York · EIA plant ID 2517 · Operator: National Grid Generation LLC
Natural gasNatural Gas Fired Combustion TurbineNatural Gas Steam TurbinePetroleum Liquids⛽ Dual-fuelNYISOBA: NYIS
Nameplate498MWSummer 481 MW
Generators5in service
Net generation441GWh12 mo to Aug 2026
Capacity factor10%gas/coal/oil units, summer MW
Heat rate12,028Btu/kWhfossil units, electric fuel, HHV
First online1958Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-50050100150200GWh2001200320052007200920112013201520172020202220242026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202510.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,00010,00011,00012,0002005201020152020202512,028 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20011,712——
20021,646.6——
20031,359.927.7%10,805
20041,845.243.8%10,156
20051,642.539.2%10,429
20061,435.234.5%10,951
20071,273.730.2%10,840
2008969.423.1%11,321
2009607.814.8%11,408
2010522.412.2%11,440
2011543.112.7%11,855
2012553.712.8%11,681
2013489.911.5%11,590
2014458.510.7%11,443
2015513.812.4%11,455
2016437.610.5%11,923
2017241.25.8%11,885
2018383.99.3%11,636
2019300.47.1%11,913
202055013.0%11,422
2021524.312.4%11,571
2022419.410.0%11,650
2023355.58.4%12,137
20243277.8%12,103
2025337.78.0%12,068

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo82,742 MMBtu
Last month with liquid burnJul 2026
Switch while operatingNo
Net summer MW on gas83
Net summer MW on oil83
Time gas → oilup to 6 h (EIA 6H)
Time oil → gasup to 6 h (EIA 6H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
3Natural Gas Steam TurbineST188192Nov 1958Operating—coming soon
4Natural Gas Steam TurbineST188193Nov 1960Operating—coming soon
GT1Petroleum LiquidsGT1612.9Dec 1966Operating—coming soon
GT2Natural Gas Fired Combustion TurbineGT5342.6Jul 2002Operating—coming soon
GT3Natural Gas Fired Combustion TurbineGT5340.1Jul 2002Operating—coming soon
2Petroleum LiquidsST4642.2Oct 1950Retired Sep 1997—coming soon
ST1Petroleum LiquidsST4642.2Dec 1948Retired Sep 1997—coming soon

Owner / operator

Operator: National Grid Generation LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
National Grid Generation LLC100.0%498 MW

Nearby plants

Within 80 km.
Stony Brook Cogen Plant47 MW5.6 km
Holtsville567 MW14.8 km
Richard M Flynn170 MW14.9 km
Shoreham Solar Commons25 MW16 km
Wading River239 MW16.9 km
Kings Park Solar II2 MW17 km