California Institute of Technology

Los Angeles County, California · EIA plant ID 10262 · Operator: California Institute-Technolgy
Natural gasNatural Gas Fired Combined CycleCAISOBA: CISO
Nameplate13MWSummer 11 MW
Generators2in service
Net generation80GWh12 mo to Aug 2026
Capacity factor83%gas/coal/oil units, summer MW
Heat rate4,853Btu/kWhfossil units, electric fuel, HHV
First online2003Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202582.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
4,0005,0006,0007,000200520102015202020254,853 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200141.4——
20020——
200300.0%—
200488.690.9%7,328
200577.179.3%7,328
20067173.0%7,328
200778.380.5%7,328
200860.862.4%7,328
20096869.9%7,328
201079.481.6%7,328
201179.581.8%7,328
20128890.2%7,328
20137577.1%7,328
201481.183.4%7,183
201581.784.0%7,328
201680.682.6%4,845
201790.392.9%4,851
201890.192.6%4,868
201988.190.6%4,864
202066.968.6%4,877
202182.685.0%4,870
202230.331.2%4,844
202315.816.3%4,828
202463.565.1%4,866
202541.842.9%4,906

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN6Natural Gas Fired Combined CycleCT10.59Aug 2003Operating—coming soon
GEN7Natural Gas Fired Combined CycleCA2.52.1Oct 2003Operating—coming soon
GEN1Natural Gas Fired Combined CycleCA11Feb 1982Retired Nov 2002—coming soon
GEN2Natural Gas Fired Combined CycleCT4.34.3May 1989Retired Nov 2002—coming soon

Owner / operator

Operator: California Institute-Technolgy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
California Institute-Technolgy100.0%13 MW

Nearby plants

Within 80 km.
CalTech - Pasadena Wilson Ave2 MW0.3 km
Caltech Central1 MW0.3 km
CalTech - Pasadena (PPA)1 MW0.4 km
Glenarm BESS Plant—2.4 km
Glenarm266 MW2.6 km
Scholl Canyon—6.5 km