Butler-Warner Generation Plant

Cumberland County, North Carolina · EIA plant ID 1016 · Operator: Public Works Comm-City of Fayetteville
Natural gasBatteriesNatural Gas Fired Combined CycleNatural Gas Fired Combustion TurbineSolar Photovoltaic⛽ Dual-fuelBA: CPLE
Nameplate305MWSummer 227 MW
Generators11in service
Net generation89GWh12 mo to Aug 2026
Capacity factor4%gas/coal/oil units, summer MW
Heat rate12,188Btu/kWhfossil units, electric fuel, HHV
First online1976Runs as peaking

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-2002040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%200520102015202020254.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002005201020152020202512,188 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001104.7——
2002216.4——
200386.43.5%12,357
200472.63.7%12,326
2005110.85.6%11,892
200651.22.6%14,733
200774.43.8%12,781
200833.91.7%13,239
200911.40.6%17,756
201075.33.8%12,206
201144.52.3%12,809
201230.71.6%13,603
2013-2.7-0.1%—
201414.40.7%17,026
201520.91.1%16,142
20165.50.3%23,694
201710.30.5%17,611
201867.33.4%12,836
20199.10.5%20,892
2020-1.8-0.1%—
2021-1.9-0.1%—
202251.52.5%12,771
202319.40.9%16,631
202441.42.0%14,384
2025112.85.7%12,162

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo232,228 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas160
Net summer MW on oil160
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combined CycleCT28.820Dec 1976Operating—coming soon
10Solar PhotovoltaicPV11Jun 2019Operating—coming soon
11BatteriesBA0.50.5Sep 2019Operating—coming soon
2Natural Gas Fired Combined CycleCT28.820Dec 1976Operating—coming soon
3Natural Gas Fired Combined CycleCT28.820Jul 1976Operating—coming soon
4Natural Gas Fired Combustion TurbineGT28.820Jul 1976Operating—coming soon
5Natural Gas Fired Combustion TurbineGT28.820Jul 1977Operating—coming soon
6Natural Gas Fired Combined CycleCT28.820Jun 1978Operating—coming soon
7Natural Gas Fired Combined CycleCT28.820Jun 1979Operating—coming soon
8Natural Gas Fired Combined CycleCT28.820May 1980Operating—coming soon
9Natural Gas Fired Combined CycleCA7365Dec 1988Operating—coming soon

Owner / operator

Operator: Public Works Comm-City of Fayetteville. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Public Works Comm-City of Fayetteville100.0%305 MW

Nearby plants

Within 80 km.
Quincy Solar4 MW3.6 km
Panda Solar NC 5, LLC1 MW6 km
Boykin PV116 MW7.4 km
Carter PV15 MW9.4 km
Collier BESS3 MW13.1 km
Rockfish Solar5 MW15.1 km