Cumberland County, North Carolina · EIA plant ID 1016 · Operator: Public Works Comm-City of Fayetteville
Nameplate305MWSummer 227 MW
Generators11in service
Net generation89GWh12 mo to Aug 2026
Capacity factor4%gas/coal/oil units, summer MW
Heat rate12,188Btu/kWhfossil units, electric fuel, HHV
First online1976Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 104.7 | — | — |
| 2002 | 216.4 | — | — |
| 2003 | 86.4 | 3.5% | 12,357 |
| 2004 | 72.6 | 3.7% | 12,326 |
| 2005 | 110.8 | 5.6% | 11,892 |
| 2006 | 51.2 | 2.6% | 14,733 |
| 2007 | 74.4 | 3.8% | 12,781 |
| 2008 | 33.9 | 1.7% | 13,239 |
| 2009 | 11.4 | 0.6% | 17,756 |
| 2010 | 75.3 | 3.8% | 12,206 |
| 2011 | 44.5 | 2.3% | 12,809 |
| 2012 | 30.7 | 1.6% | 13,603 |
| 2013 | -2.7 | -0.1% | — |
| 2014 | 14.4 | 0.7% | 17,026 |
| 2015 | 20.9 | 1.1% | 16,142 |
| 2016 | 5.5 | 0.3% | 23,694 |
| 2017 | 10.3 | 0.5% | 17,611 |
| 2018 | 67.3 | 3.4% | 12,836 |
| 2019 | 9.1 | 0.5% | 20,892 |
| 2020 | -1.8 | -0.1% | — |
| 2021 | -1.9 | -0.1% | — |
| 2022 | 51.5 | 2.5% | 12,771 |
| 2023 | 19.4 | 0.9% | 16,631 |
| 2024 | 41.4 | 2.0% | 14,384 |
| 2025 | 112.8 | 5.7% | 12,162 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo232,228 MMBtu
Last month with liquid burnAug 2026
Switch while operatingYes
Net summer MW on gas160
Net summer MW on oil160
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | Dec 1976 | Operating | — | coming soon |
| 10 | Solar Photovoltaic | PV | 1 | 1 | Jun 2019 | Operating | — | coming soon |
| 11 | Batteries | BA | 0.5 | 0.5 | Sep 2019 | Operating | — | coming soon |
| 2 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | Dec 1976 | Operating | — | coming soon |
| 3 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | Jul 1976 | Operating | — | coming soon |
| 4 | Natural Gas Fired Combustion Turbine | GT | 28.8 | 20 | Jul 1976 | Operating | — | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 28.8 | 20 | Jul 1977 | Operating | — | coming soon |
| 6 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | Jun 1978 | Operating | — | coming soon |
| 7 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | Jun 1979 | Operating | — | coming soon |
| 8 | Natural Gas Fired Combined Cycle | CT | 28.8 | 20 | May 1980 | Operating | — | coming soon |
| 9 | Natural Gas Fired Combined Cycle | CA | 73 | 65 | Dec 1988 | Operating | — | coming soon |
Owner / operator
Operator: Public Works Comm-City of Fayetteville. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Public Works Comm-City of Fayetteville | 100.0% | 305 MW |
Nearby plants
Within 80 km.
| Quincy Solar | 4 MW | 3.6 km |
| Panda Solar NC 5, LLC | 1 MW | 6 km |
| Boykin PV1 | 16 MW | 7.4 km |
| Carter PV1 | 5 MW | 9.4 km |
| Collier BESS | 3 MW | 13.1 km |