← Back to map

Collier BESS

Cumberland County, North Carolina · EIA plant ID 65248 · Operator: North Carolina El Member Corp
BatteryBatteriesBA: CPLE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-40-30-20-100MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-0.2——
2025-0.2——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAT1BatteriesBA2.52.5Dec 2024Operating—coming soon

Owner / operator

Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Carolina El Member Corp100.0%3 MW

Nearby plants

Within 80 km.
Butler-Warner Generation Plant305 MW13.1 km
Bunn Level Farm, LLC5 MW15.6 km
Boykin PV116 MW16.3 km
Docs Road BESS5 MW16.4 km
Quincy Solar4 MW16.6 km
Royal Solar5 MW18.3 km