Waterloo
Monroe County, Illinois · EIA plant ID 971 · Operator: City of Waterloo - (IL)
Nameplate38MWSummer 36 MW
Generators14in service
Net generation1GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate12,250Btu/kWhfossil units, electric fuel, HHV
First online1946Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 0.1 | — | — |
| 2002 | 0.5 | — | — |
| 2003 | 0.5 | 0.3% | 11,405 |
| 2004 | 0.5 | 0.3% | 8,867 |
| 2005 | 1.8 | 1.3% | 11,949 |
| 2006 | 0.4 | 0.3% | 11,924 |
| 2007 | 0.4 | 0.3% | 12,010 |
| 2008 | 0.5 | 0.3% | 12,286 |
| 2009 | 0.3 | 0.2% | 13,155 |
| 2010 | 0.2 | 0.1% | 12,485 |
| 2011 | 0.6 | 0.4% | 12,004 |
| 2012 | 0.6 | 0.3% | 10,237 |
| 2013 | 0.5 | 0.2% | 15,248 |
| 2014 | 0.8 | 0.3% | 12,513 |
| 2015 | 0.4 | 0.1% | 8,569 |
| 2016 | 0.2 | 0.1% | 15,809 |
| 2017 | 0.6 | 0.3% | 10,954 |
| 2018 | 0.5 | 0.2% | 12,143 |
| 2019 | 0.5 | 0.2% | 13,083 |
| 2020 | 0.5 | 0.2% | 12,088 |
| 2021 | 1.1 | 0.4% | 8,846 |
| 2022 | 0.6 | 0.2% | 12,038 |
| 2023 | 0.5 | 0.2% | 11,816 |
| 2024 | 0.5 | 0.2% | 11,823 |
| 2025 | 0.8 | 0.3% | 12,250 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo648 MMBtu
Last month with liquid burnDec 2025
Switch while operatingYes
Net summer MW on gas13
Net summer MW on oil13
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 3.1 | 2.7 | May 1970 | Operating (Standby / backup) | — | coming soon |
| 10 | Petroleum Liquids | IC | 1.8 | 1.8 | Jun 1996 | Operating | — | coming soon |
| 11 | Petroleum Liquids | IC | 1.8 | 1.8 | Jun 1996 | Operating | — | coming soon |
| 12 | Natural Gas Fired Combustion Turbine | GT | 6.6 | 6.6 | May 2002 | Operating | — | coming soon |
| 13 | Natural Gas Fired Combustion Turbine | GT | 7 | 6.6 | May 2012 | Operating | — | coming soon |
| 14 | Natural Gas Fired Combustion Turbine | GT | 8 | 7.5 | Jan 2026 | Operating | — | coming soon |
| 2 | Petroleum Liquids | IC | 0.2 | 0.2 | Jun 1954 | Operating (Out of service) | — | coming soon |
| 3 | Petroleum Liquids | IC | 0.2 | 0.2 | Jun 1946 | Operating (Out of service) | — | coming soon |
| 4 | Petroleum Liquids | IC | 2 | 1.8 | May 1963 | Operating (Standby / backup) | — | coming soon |
| 5 | Petroleum Liquids | IC | 0.5 | 0.4 | Jun 1950 | Operating (Out of service) | — | coming soon |
| 6 | Petroleum Liquids | IC | 0.5 | 0.5 | Jun 1950 | Operating (Out of service) | — | coming soon |
| 7 | Petroleum Liquids | IC | 1.7 | 1.5 | Jun 1959 | Operating (Standby / backup) | — | coming soon |
| 8 | Petroleum Liquids | IC | 3 | 2.4 | Apr 1973 | Operating (Standby / backup) | — | coming soon |
| 9 | Petroleum Liquids | IC | 1.8 | 1.8 | Jun 1996 | Operating | — | coming soon |
Owner / operator
Operator: City of Waterloo - (IL). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Waterloo - (IL) | 100.0% | 38 MW |
Nearby plants
Within 80 km.
| Meramec | retired | 17.1 km |
| Castle Bluff Energy Center | — | 17.1 km |
| Red Bud | 15 MW | 19.2 km |
| Millstadt IL 1, LLC | 3 MW | 19.2 km |
| AES Belleville Solar LLC | 10 MW | 21.2 km |
| SV CSG Reifschneider I B, LLC | 2 MW | 21.2 km |