Sherwood H Smith Jr Energy Complex
Richmond County, North Carolina · EIA plant ID 7805 · Operator: Duke Energy Progress - (NC)
Nameplate2,245MWSummer 1,883 MW
Generators11in service
Net generation9,743GWh12 mo to Aug 2026
Capacity factor59%gas/coal/oil units, summer MW
Heat rate8,100Btu/kWhfossil units, electric fuel, HHV
First online2001Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 542.4 | — | — |
| 2002 | 1,479.9 | — | — |
| 2003 | 1,048.2 | 9.6% | 8,856 |
| 2004 | 1,744.1 | 15.9% | 8,081 |
| 2005 | 2,167.4 | 19.8% | 8,393 |
| 2006 | 1,785.5 | 16.6% | 8,468 |
| 2007 | 2,371.9 | 22.0% | 8,602 |
| 2008 | 2,460.5 | 21.8% | 8,342 |
| 2009 | 3,125.4 | 27.7% | 7,786 |
| 2010 | 4,739.3 | 41.9% | 8,473 |
| 2011 | 7,081.1 | 49.0% | 7,867 |
| 2012 | 9,278.6 | 55.0% | 7,663 |
| 2013 | 9,080.4 | 55.4% | 7,247 |
| 2014 | 7,684.2 | 47.0% | 7,302 |
| 2015 | 10,412.6 | 63.6% | 8,129 |
| 2016 | 10,658.2 | 65.8% | 8,168 |
| 2017 | 10,229.5 | 63.3% | 7,702 |
| 2018 | 11,895.7 | 73.6% | 8,089 |
| 2019 | 9,392.6 | 57.7% | 7,771 |
| 2020 | 8,581.1 | 52.7% | 7,692 |
| 2021 | 8,266.5 | 50.9% | 7,824 |
| 2022 | 9,920.4 | 61.1% | 7,939 |
| 2023 | 8,597.6 | 52.1% | 7,741 |
| 2024 | 9,424.3 | 57.0% | 7,803 |
| 2025 | 9,853.1 | 59.7% | 8,078 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo250,098 MMBtu
Last month with liquid burnFeb 2026
Switch while operatingYes
Net summer MW on gas1,857
Net summer MW on oil1,856
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | GT | 199.4 | 165 | May 2001 | Operating | — | coming soon |
| 10 | Natural Gas Fired Combined Cycle | CT | 191.2 | 178 | Jun 2011 | Operating | — | coming soon |
| 2 | Natural Gas Fired Combustion Turbine | GT | 199.4 | 164 | May 2001 | Operating | — | coming soon |
| 3 | Natural Gas Fired Combustion Turbine | GT | 199.4 | 160 | May 2001 | Operating | — | coming soon |
| 4 | Natural Gas Fired Combustion Turbine | GT | 199.4 | 159 | May 2001 | Operating | — | coming soon |
| 6 | Natural Gas Fired Combustion Turbine | GT | 199.4 | 152 | Jun 2002 | Operating | — | coming soon |
| 7 | Natural Gas Fired Combined Cycle | CT | 199.4 | 152 | Jun 2002 | Operating | — | coming soon |
| 8 | Natural Gas Fired Combined Cycle | CT | 199.4 | 152 | Jun 2002 | Operating | — | coming soon |
| 9 | Natural Gas Fired Combined Cycle | CT | 191.2 | 178 | Jun 2011 | Operating | — | coming soon |
| ST4 | Natural Gas Fired Combined Cycle | CA | 195.5 | 171 | Jun 2002 | Operating | — | coming soon |
| ST5 | Natural Gas Fired Combined Cycle | CA | 271.1 | 252 | Jun 2011 | Operating | — | coming soon |
Owner / operator
Operator: Duke Energy Progress - (NC). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Duke Energy Progress - (NC) | 100.0% | 2,245 MW |
Nearby plants
Within 80 km.
| Hamlet Generating Facility | 344 MW | 0.5 km |
| Hamlet Solar Energy Storage | 1 MW | 1 km |
| McKinney BESS | 5 MW | 7.6 km |
| ESA Hamlet NC , LLC | 5 MW | 7.6 km |
| Sellers Farm Solar | 5 MW | 8.4 km |
| County Home Solar LLC | 5 MW | 9.7 km |