← Back to map

McKinney BESS

Richmond County, North Carolina · EIA plant ID 65241 · Operator: North Carolina El Member Corp
BatteryBatteriesBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-60-40-200MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-0.5——
2025-0.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAT1BatteriesBA55Dec 2024Operating—coming soon

Owner / operator

Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Carolina El Member Corp100.0%5 MW

Nearby plants

Within 80 km.
County Home Solar LLC5 MW3.8 km
Pecan PV15 MW6.6 km
Hamlet Solar Energy Storage1 MW7 km
Hamlet Generating Facility344 MW7.3 km
Sherwood H Smith Jr Energy Complex2,245 MW7.6 km
ESA Hamlet NC , LLC5 MW8.2 km