Allatoona
Bartow County, Georgia · EIA plant ID 760 · Operator: USCE-Mobile District
Nameplate87MWSummer 72 MW
Generators3in service
Net generation111GWh12 mo to Dec 2025
Capacity factor18%hydro units, summer MW
Heat rate—thermal plants only
First online1950
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 122.2 | 17.0% | — |
| 2002 | 100.6 | 17.2% | — |
| 2003 | 199.7 | 34.0% | — |
| 2004 | 155.9 | 24.6% | — |
| 2005 | 169.3 | 26.8% | — |
| 2006 | 88 | 14.0% | — |
| 2007 | 50.6 | 8.0% | — |
| 2008 | 58 | 9.2% | — |
| 2009 | 151.6 | 24.0% | — |
| 2010 | 121.6 | 19.3% | — |
| 2011 | 82.8 | 13.1% | — |
| 2012 | 66.6 | 10.5% | — |
| 2013 | 188.3 | 29.8% | — |
| 2014 | 67.7 | 10.7% | — |
| 2015 | 0 | 0.0% | — |
| 2017 | 9.2 | 1.5% | — |
| 2018 | 133.2 | 21.1% | — |
| 2019 | 192.6 | 30.5% | — |
| 2020 | 188.7 | 29.8% | — |
| 2021 | 169.2 | 26.8% | — |
| 2022 | 146.4 | 23.2% | — |
| 2023 | 111.5 | 17.7% | — |
| 2024 | 122.5 | 19.4% | — |
| 2025 | 110.5 | 17.5% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Conventional Hydroelectric | HY | 42.3 | 35 | Jan 1950 | Operating | — | coming soon |
| 2 | Conventional Hydroelectric | HY | 42.3 | 35 | Mar 1950 | Operating | — | coming soon |
| A | Conventional Hydroelectric | HY | 2 | 2 | Feb 1950 | Operating | — | coming soon |
Owner / operator
Operator: USCE-Mobile District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| USCE-Mobile District | 100.0% | 87 MW |
Nearby plants
Within 80 km.
| Allatoona Substation #10 | 10 MW | 8.6 km |
| Bartow Davidson | 3 MW | 14.1 km |
| Bowen | 3,499 MW | 18.3 km |
| Solar BESS Hybrid | 4 MW | 25.9 km |
| Gordon Pine Hall | 2 MW | 30.8 km |
| Gordon Thompson | 3 MW | 31 km |