Bartow County, Georgia · EIA plant ID 66980 · Operator: Madison Energy Holdings LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202625.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.9——
2024626.1%—
20255.725.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SP319Solar PhotovoltaicPV2.62.6Dec 2023Operating—coming soon

Owner / operator

Operator: Madison Energy Holdings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Madison Energy Holdings LLC100.0%3 MW

Nearby plants

Within 80 km.
Allatoona87 MW14.1 km
Bowen3,499 MW16.9 km
Allatoona Substation #1010 MW21.6 km
Gordon Pine Hall2 MW23.4 km
Gordon Thompson3 MW23.5 km
Rockmart3 MW32.2 km