Fry Ontario Solar ProjectUnder construction

Malheur County, Oregon · EIA plant ID 70516 · Operator: Fry Foods, Inc.
SolarBA: IPCO

4 MW under construction (Solar Photovoltaic), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 4 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV4.24.2planned Mar 2027Under construction—coming soon

Owner / operator

Operator: Fry Foods, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Ontario Solar Center3 MW2.3 km
Verde Light Community Solar3 MW6.8 km
Hyline Solar Center, LLC9 MW7.1 km
Railroad Solar Center, LLC5 MW11.8 km
Morgan Solar Center3 MW16 km
Weiser BESS3 MW17.7 km