← Back to map

Railroad Solar Center, LLC

Malheur County, Oregon · EIA plant ID 60333 · Operator: Cypress Creek Renewables
SolarSolar PhotovoltaicBA: IPCO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202624.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.23.5%—
20179.423.8%—
201810.125.7%—
201910.125.6%—
202010.225.7%—
202110.426.4%—
20221025.5%—
20239.824.9%—
20249.724.5%—
202510.225.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RSC1Solar PhotovoltaicPV4.54.5Nov 2016Operating—coming soon

Owner / operator

Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Cypress Creek Renewables100.0%5 MW

Nearby plants

Within 80 km.
Morgan Solar Center3 MW5.6 km
Verde Light Community Solar3 MW8.9 km
Thunderegg Solar Center, LLC10 MW11.8 km
Fry Ontario Solar Project—11.8 km
Vale Air Solar Center, LLC10 MW13.1 km
Ontario Solar Center3 MW14 km