Hoyte SolarUnder construction
Milam County, Texas · EIA plant ID 70514 · Operator: Milano Solar LLC
207 MW under construction (Solar Photovoltaic), first expected Jul 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 207 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | PV | 206.8 | 206.8 | planned Jul 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Milano Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Two Rivers Solar | — | 16.6 km |
| TX11 Republic Road Storage | 50 MW | 22.6 km |
| Dansby | 203 MW | 29.9 km |
| OTHERTexasA&M | 10 MW | 31.2 km |
| BT Jungmann | 40 MW | 33.8 km |
| Walleye Solar (Sandow II) | — | 34.4 km |