Walleye Solar (Sandow II)Planned
Milam County, Texas · EIA plant ID 68231 · Operator: EDF Renewable Asset Holdings, Inc.
369 MW planned (Solar Photovoltaic), first expected Dec 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SDTWO | Solar Photovoltaic | PV | 369 | 369 | planned Dec 2026 | Planned | — | coming soon |
Owner / operator
Operator: EDF Renewable Asset Holdings, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Stoneridge Solar, LLC | 200 MW | 2.4 km |
| Gransolar Texas One, LLC | 50 MW | 7.4 km |
| Adelite Storage Project LLC | — | 13.3 km |
| Sandow Lakes Energy Station | — | 19.5 km |
| TX21 River Valley Storage 2 | 50 MW | 31 km |
| TX19 River Valley Storage 1 | 50 MW | 31.2 km |