Adelite Storage Project LLCPlanned

Milam County, Texas · EIA plant ID 69004 · Operator: Acciona Energy USA Global, LLC
BatteryERCOTBA: ERCO

230 MW planned (Batteries), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ADELIBatteriesBA230230planned Mar 2028Planned—coming soon

Owner / operator

Operator: Acciona Energy USA Global, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Gransolar Texas One, LLC50 MW5.9 km
Stoneridge Solar, LLC200 MW11.2 km
Walleye Solar (Sandow II)—13.3 km
Sandow Lakes Energy Station—22.6 km
TX21 River Valley Storage 250 MW27 km
TX19 River Valley Storage 150 MW27 km