Pawnee Solar & BESSUnder construction

Morgan County, Colorado · EIA plant ID 70462 · Operator: Public Service Co of Colorado
SolarBA: PSCO

450 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 450 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PAWBBatteriesBA200200planned Dec 2027Under construction—coming soon
PAWSSolar PhotovoltaicPV250250planned Dec 2027Under construction—coming soon

Owner / operator

Operator: Public Service Co of Colorado. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
South Platte Solar—7.6 km
Manchief Electric Generating Station300 MW10.5 km
Pawnee552 MW11.1 km
Brush Generation Facility273 MW15 km
Fort Morgan Solar3 MW16.1 km
Pivot Solar 14 LLC (CSG)2 MW16.5 km