← Back to map

Fort Morgan Solar

Morgan County, Colorado · EIA plant ID 70121 · Operator: SE Municipal Colorado, LLC
SolarSolar PhotovoltaicBA: WACM
Nameplate3MWSummer 3 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV3.43.4Dec 2025Operating—coming soon

Owner / operator

Operator: SE Municipal Colorado, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SE Municipal Colorado, LLC100.0%3 MW

Nearby plants

Within 80 km.
Western Sugar Coop- Ft Morgan3 MW2 km
Raceway Solar - (CO)—3.8 km
Manchief Electric Generating Station300 MW9.9 km
Pawnee552 MW10 km
South Platte Solar—10.1 km
Pivot Solar 2 LLC (CSG)2 MW10.7 km