RITC Solar and Battery Rooftop System
Los Angeles County, California · EIA plant ID 70449 · Operator: City of Burbank Water and Power
Nameplate5MWSummer 5 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| RPV1 | Solar Photovoltaic | PV | 1.9 | 1.9 | Apr 2026 | Operating | — | coming soon |
| TSBT1 | Batteries | BA | 2.6 | 2.6 | Apr 2026 | Operating | — | coming soon |
Owner / operator
Operator: City of Burbank Water and Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Burbank Water and Power | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Magnolia Power Project | 388 MW | 3.6 km |
| Lake One | 61 MW | 3.7 km |
| North Hollywood | retired | 3.7 km |
| Olive | 110 MW | 3.7 km |
| Xebec 1 | 2 MW | 5.2 km |
| Comcast - Universal City | 1 MW | 6.2 km |