← Back to map

Comcast - Universal City

Los Angeles County, California · EIA plant ID 65211 · Operator: Bloom Energy
Natural gasOther Natural GasCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor78%gas/coal/oil units, summer MW
Heat rate8,110Btu/kWhfossil units, electric fuel, HHV
First online2021Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20212022202320242025202678.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0007,0008,0002021202220232024202520268,110 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20212.171.9%6,369
20227.888.5%6,651
20237.888.6%6,781
20247.889.0%6,981
20256.978.2%8,110

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CMC04Other Natural GasFC11Sep 2021Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bloom Energy100.0%1 MW

Nearby plants

Within 80 km.
CBS Studio Centerretired2.9 km
Toyon Power Station1 MW5.2 km
Olive110 MW6 km
Lake One61 MW6.1 km
Franklin (CA)2 MW6.1 km
Magnolia Power Project388 MW6.2 km