← Back to map

MN CSG 2019-57Planned

Blue Earth County, Minnesota · EIA plant ID 70301 · Operator: MN CSG 2019-57 LLC
SolarMISOBA: MISO

1 MW planned (Solar Photovoltaic), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BOHRESolar PhotovoltaicPV11planned Mar 2027Planned—coming soon

Owner / operator

Operator: MN CSG 2019-57 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
USS Jayhawk Solar LLC (CSG)1 MW1.8 km
MN CSG 2019-16 LLC1 MW1.8 km
Primrose Solar, LLC1 MW2.1 km
CF Novel Solar CSG Gardens Eleven, LLC3 MW2.3 km
EESolar22—3.1 km
Mankato Energy Center741 MW3.4 km