Primrose Solar, LLC

Blue Earth County, Minnesota · EIA plant ID 63314 · Operator: Geronimo Energy
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20212022202320242025202622.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20211.928.3%—
2022223.3%—
20232.124.3%—
2024222.9%—
2025222.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PROSESolar PhotovoltaicPV11Apr 2021Operating—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geronimo Energy100.0%1 MW

Nearby plants

Within 80 km.
MN CSG 2019-16 LLC1 MW1.8 km
Wilmarth25 MW2 km
Mankato Energy Center741 MW2 km
MN CSG 2019-57—2.1 km
Archer Daniels Midland Mankato6 MW2.3 km
School Sisters CSG1 MW3.1 km