← Back to map

Westside - (NM)Under construction

San Juan County, New Mexico · EIA plant ID 70261 · Operator: Saddle Butte Energy Farmington, LLC
Natural gasSPPBA: SWPP

60 MW under construction (Natural Gas Internal Combustion Engine), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 60 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WS01Natural Gas Internal Combustion EngineIC1616planned Mar 2027Under construction—coming soon
WS02Natural Gas Internal Combustion EngineIC2424planned Jan 2028Under construction—coming soon
WS03Natural Gas Internal Combustion EngineIC2020planned May 2028Under construction—coming soon

Owner / operator

Operator: Saddle Butte Energy Farmington, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Rockmont Solar and Storage Project—6 km
Bluffview86 MW9.7 km
San Juan Solar I300 MW10.5 km
Animasretired11.3 km
San Juanretired12.3 km
Four Mile Mesa Solar, LLC—13.4 km