Drennan Energy StoragePlanned
El Paso County, Colorado · EIA plant ID 70050 · Operator: Drennan Energy Storage LLC
100 MW planned (Batteries), first expected Mar 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DRENN | Batteries | BA | 100 | 100 | planned Mar 2028 | Planned | — | coming soon |
Owner / operator
Operator: Drennan Energy Storage LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Horizon | — | 0.2 km |
| Pikes Peak Solar Garden 1 LLC CSG | 2 MW | 6.8 km |
| Fort Carson Battery Energy Storage System | 4 MW | 10.1 km |
| Carson Solar I | 2 MW | 11.4 km |
| Martin Drake | 245 MW | 15.5 km |
| Ray D Nixon | 283 MW | 15.9 km |