← Back to map

Pikes Peak Solar Garden 1 LLC CSG

El Paso County, Colorado · EIA plant ID 59848 · Operator: Pikes Peak Solar Garden 1 LLC
SolarSolar PhotovoltaicBA: WACM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20162018202020222024202624.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20151.416.3%—
20164.626.0%—
20173.520.1%—
2018422.6%—
2019423.1%—
20204.827.6%—
20215.531.1%—
20225.229.8%—
20231057.0%—
2024528.3%—
20254.224.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PPSG1Solar PhotovoltaicPV22Jul 2015Operating—coming soon

Owner / operator

Operator: Pikes Peak Solar Garden 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pikes Peak Solar Garden 1 LLC100.0%2 MW

Nearby plants

Within 80 km.
Fort Carson Battery Energy Storage System4 MW4.2 km
Carson Solar I2 MW6.5 km
Drennan Energy Storage—6.8 km
Horizon—6.8 km
Martin Drake245 MW9.4 km
George Birdsallretired13.4 km