← Back to map

Stellar Wright BESSUnder construction

Merced County, California · EIA plant ID 69925 · Operator: Stellar Renewable Power
BatteryCAISOBA: CISO

85 MW under construction (Batteries), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 85 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SWBA1BatteriesBA84.880planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Stellar Renewable Power. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Wright Solar Park200 MW0.6 km
Merced 1 PV3 MW7.9 km
Lara 2 Hybrid2 MW7.9 km
Merced BESS—7.9 km
W R Gianelli424 MW12.2 km
ONeill25 MW12.5 km