← Back to map

Wright Solar Park

Merced County, California · EIA plant ID 59525 · Operator: Wright Solar Park, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation402GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20192020202120222023202420252026202723.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20190.90.6%—
2020487.627.8%—
2021502.628.7%—
2022481.327.5%—
2023462.726.4%—
2024337.919.2%—
2025402.723.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FRWSPSolar PhotovoltaicPV200200Dec 2019Operating—coming soon

Owner / operator

Operator: Wright Solar Park, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
KKR/GA100.0%200 MW

Nearby plants

Within 80 km.
Stellar Wright BESS—0.6 km
Merced 1 PV3 MW7.4 km
Lara 2 Hybrid2 MW7.4 km
Merced BESS—7.4 km
W R Gianelli424 MW12.6 km
ONeill25 MW12.8 km