← Back to map

7999 Gateway Solar

Alameda County, California · EIA plant ID 69896 · Operator: Coast Energy Holdings, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
7999GSolar PhotovoltaicPV4.64.6Sep 2026Operating—coming soon

Owner / operator

Operator: Coast Energy Holdings, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Coast Energy Holdings, LLC100.0%5 MW

Nearby plants

Within 80 km.
Gateway#1&2 (Newark CA)—2.9 km
Delta Electronics Fremont1 MW8.8 km
Union Sanitary District Cogen2 MW8.8 km
Fremont CA AutoFactory0 MW9 km
Life Technologies - Fremont1 MW9.6 km
Fremont - Kato Rd1 MW10.6 km