Life Technologies - Fremont

Alameda County, California · EIA plant ID 66145 · Operator: Bloom Energy
Natural gasOther Natural GasCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor91%gas/coal/oil units, summer MW
Heat rate7,056Btu/kWhfossil units, electric fuel, HHV
First online2020Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2022202320242025202691.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,6006,8007,000202220232024202520267,056 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202210.289.3%6,761
20239.987.2%6,771
20241087.3%7,105
202510.491.1%7,056

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TMF06Other Natural GasFC1.31.3Dec 2020Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bloom Energy100.0%1 MW

Nearby plants

Within 80 km.
Fremont CA AutoFactory0 MW0.8 km
Delta Electronics Fremont1 MW0.9 km
Fremont - Kato Rd1 MW1.1 km
SJ/SC WPCP14 MW5.9 km
Zero Waste Energy Development Co LLC2 MW6.2 km
AmericoldCA - Plainville, CT2 MW6.5 km