← Back to map

Libra SolarUnder construction

Lyon County, Nevada · EIA plant ID 69857 · Operator: Libra Solar LLC
BatteryBA: NEVP

1,400 MW under construction (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 1,400 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LBRBSBatteriesBA700700planned Dec 2027Under construction—coming soon
LBRPVSolar PhotovoltaicPV700700planned Dec 2027Under construction—coming soon

Owner / operator

Operator: Libra Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Fort Churchill230 MW29.1 km
Ft. Churchill PV20 MW29.5 km
Whitegrass No. 16 MW34.7 km
ENEL Salt Wells LLC24 MW55 km
Don A Campbell 2 Geothermal20 MW55.6 km
Don A Campbell 1 Geothermal20 MW55.7 km