Ft. Churchill PV

Lyon County, Nevada · EIA plant ID 59472 · Operator: Sierra Pacific Power Co
SolarSolar PhotovoltaicBA: NEVP
Nameplate20MWSummer 20 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor4%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2016201820202022202420264.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201514.412.3%—
201639.822.8%—
201736.520.9%—
201835.420.3%—
201936.420.9%—
202036.721.0%—
202130.517.9%—
202225.915.2%—
202323.713.9%—
202422.212.9%—
20257.14.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NVC7Solar PhotovoltaicPV19.919.5May 2015Operating—coming soon

Owner / operator

Operator: Sierra Pacific Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sierra Pacific Power Co100.0%20 MW

Nearby plants

Within 80 km.
Fort Churchill230 MW0.7 km
Whitegrass No. 16 MW5.2 km
Libra Solar—29.5 km
Lahontan2 MW37.7 km
New Lahontan4 MW37.9 km
Washoe3 MW41.1 km