Liberty StationPlanned
Casey County, Kentucky · EIA plant ID 69726 · Operator: East Kentucky Power Coop, Inc
217 MW planned (Natural Gas Internal Combustion Engine), first expected Dec 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| L1 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L10 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L11 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L12 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L2 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L3 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L4 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L5 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L6 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L7 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L8 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
| L9 | Natural Gas Internal Combustion Engine | IC | 18.1 | 17.8 | planned Dec 2028 | Planned | — | coming soon |
Owner / operator
Operator: East Kentucky Power Coop, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Cox Waste to Energy | 5 MW | 36.1 km |
| Frontier Solar | — | 36.7 km |
| Cooperative Solar Three-Marion | — | 36.7 km |
| SR Turkey Creek, LLC | 50 MW | 42.4 km |
| E W Brown | 1,458 MW | 51.4 km |
| Dix Dam | 28 MW | 51.5 km |