← Back to map

Liberty StationPlanned

Casey County, Kentucky · EIA plant ID 69726 · Operator: East Kentucky Power Coop, Inc
Natural gasPJMBA: PJM

217 MW planned (Natural Gas Internal Combustion Engine), first expected Dec 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
L1Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L10Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L11Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L12Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L2Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L3Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L4Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L5Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L6Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L7Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L8Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon
L9Natural Gas Internal Combustion EngineIC18.117.8planned Dec 2028Planned—coming soon

Owner / operator

Operator: East Kentucky Power Coop, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Cox Waste to Energy5 MW36.1 km
Frontier Solar—36.7 km
Cooperative Solar Three-Marion—36.7 km
SR Turkey Creek, LLC50 MW42.4 km
E W Brown1,458 MW51.4 km
Dix Dam28 MW51.5 km