E W Brown
Mercer County, Kentucky · EIA plant ID 1355 · Operator: Kentucky Utilities Co
125 MW under construction (Batteries), first expected May 2027 · EIA-860M
Nameplate1,458MWSummer 1,328 MW
Generators9in service · 125 MW building
Net generation1,853GWh12 mo to Aug 2026
Capacity factor16%gas/coal/oil units, summer MW
Heat rate12,017Btu/kWhfossil units, electric fuel, HHV
First online1971Runs as peaking
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 3,916 | — | — |
| 2002 | 4,005.6 | — | — |
| 2003 | 4,126.7 | 28.6% | 10,464 |
| 2004 | 3,819.8 | 28.1% | 10,593 |
| 2005 | 3,683.4 | 27.2% | 10,655 |
| 2006 | 3,805.2 | 28.1% | 10,750 |
| 2007 | 4,106.2 | 30.3% | 10,553 |
| 2008 | 4,193.2 | 30.9% | 10,575 |
| 2009 | 2,581.4 | 19.1% | 10,813 |
| 2010 | 3,131.9 | 23.1% | 11,037 |
| 2011 | 2,570.8 | 19.6% | 11,527 |
| 2012 | 2,616 | 19.9% | 11,360 |
| 2013 | 2,961.4 | 22.6% | 11,316 |
| 2014 | 3,142.7 | 24.0% | 11,559 |
| 2015 | 2,829.6 | 20.3% | 11,716 |
| 2016 | 2,266.5 | 16.2% | 11,911 |
| 2017 | 1,657.4 | 11.8% | 11,897 |
| 2018 | 2,543.5 | 18.2% | 11,757 |
| 2019 | 1,430 | 12.0% | 11,919 |
| 2020 | 1,281.8 | 10.9% | 11,883 |
| 2021 | 1,113.6 | 9.5% | 12,102 |
| 2022 | 1,382 | 11.8% | 11,894 |
| 2023 | 964.1 | 8.2% | 11,955 |
| 2024 | 1,520.4 | 13.0% | 11,943 |
| 2025 | 1,626.5 | 14.0% | 11,967 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo8,814 MMBtu
Last month with liquid burnMay 2026
Switch while operatingYes
Net summer MW on gas484
Net summer MW on oil484
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10 | Natural Gas Fired Combustion Turbine | GT | 126 | 121 | Dec 1995 | Operating | — | coming soon |
| 11 | Natural Gas Fired Combustion Turbine | GT | 126 | 121 | May 1996 | Operating | — | coming soon |
| 3 | Conventional Steam Coal | ST | 464 | 412 | Jul 1971 | Operating | — | coming soon |
| 5 | Natural Gas Fired Combustion Turbine | GT | 123 | 130 | Jun 2001 | Operating | — | coming soon |
| 6 | Natural Gas Fired Combustion Turbine | GT | 176.8 | 146 | Aug 1999 | Operating | — | coming soon |
| 7 | Natural Gas Fired Combustion Turbine | GT | 176.8 | 146 | Aug 1999 | Operating | — | coming soon |
| 8 | Natural Gas Fired Combustion Turbine | GT | 126 | 121 | Feb 1995 | Operating | — | coming soon |
| 9 | Natural Gas Fired Combustion Turbine | GT | 126 | 121 | Aug 1994 | Operating | — | coming soon |
| SOLAR | Solar Photovoltaic | PV | 13 | 10 | May 2016 | Operating | — | coming soon |
| BESS | Batteries | BA | 125 | 125 | planned May 2027 | Under construction | — | coming soon |
| 1 | Conventional Steam Coal | ST | 113.6 | 106 | May 1957 | Retired Feb 2019 | — | coming soon |
| 2 | Conventional Steam Coal | ST | 179.5 | 166 | Jun 1963 | Retired Feb 2019 | — | coming soon |
Owner / operator
Operator: Kentucky Utilities Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Kentucky Utilities Co | 86.0% | 1,253 MW |
| Louisville Gas & Electric Co | 14.0% | 205 MW |
Nearby plants
Within 80 km.
| Dix Dam | 28 MW | 0.9 km |
| Mother Ann Lee | 2 MW | 4.7 km |
| SR Turkey Creek, LLC | 50 MW | 25.2 km |
| AEUG Madison Solar, LLC | — | 36.4 km |
| Haefling | 41 MW | 36.5 km |
| Cooperative Solar Two-Fayette | — | 44.3 km |