← Back to map

San Diego Sockers

San Diego County, California · EIA plant ID 69712 · Operator: Hero Drive Solar Project 2023, LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators2in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.20.40.60.81MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%100%202520260.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202500.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
162BBatteriesBA0.50.5Oct 2025Operating—coming soon
16CSolar PhotovoltaicPV0.60.6Oct 2025Operating—coming soon

Owner / operator

Operator: Hero Drive Solar Project 2023, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hero Drive Solar Project 2023, LLC100.0%1 MW

Nearby plants

Within 80 km.
Gilead Oceanside Solar Project2 MW1.2 km
Genentech-Oceanside Hybrid7 MW1.5 km
GEN005 Antibody Fuel Cell3 MW1.5 km
Vista Energy Storage System 40 MW5.7 km
Melrose BESS20 MW5.8 km
San Diego - NCRC at Vista2 MW5.8 km