← Back to map

Melrose BESS

San Diego County, California · EIA plant ID 66281 · Operator: San Diego Gas & Electric Co
BatteryBatteriesCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators2in service
Net generation-2GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-500-400-300-200-1000MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-2.4——
2025-2.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1BatteriesBA1010Mar 2024Operating—coming soon
2BatteriesBA1010Mar 2024Operating—coming soon

Owner / operator

Operator: San Diego Gas & Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
San Diego Gas & Electric Co100.0%20 MW

Nearby plants

Within 80 km.
Vista Energy Storage System 40 MW0.4 km
San Diego - NCRC at Vista2 MW1.9 km
GEN005 Antibody Fuel Cell3 MW4.3 km
Genentech-Oceanside Hybrid7 MW4.4 km
Gilead Oceanside Solar Project2 MW4.8 km
San Diego Sockers1 MW5.8 km