Pitts Dudik Solar II
Hill County, Texas · EIA plant ID 69674 · Operator: Elawan Pitts Dudik Solar II, LLC
Nameplate30MWSummer 30 MW
Generators1in service
Net generation34GWh12 mo to Aug 2026
Capacity factor74%solar units, summer MW
Heat rate—thermal plants only
First online2026
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PDII | Solar Photovoltaic | PV | 30.4 | 30.4 | Jul 2026 | Operating | — | coming soon |
Owner / operator
Operator: Elawan Pitts Dudik Solar II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Elawan Pitts Dudik Solar II, LLC | 100.0% | 30 MW |
Nearby plants
Within 80 km.
| Pitts Dudik Solar | 50 MW | 0.4 km |
| Hubbard Wind II | 305 MW | 9.6 km |
| Payne Battlecreek Solar | — | 12.5 km |
| Ash Creek BESS | — | 13 km |
| Sun Valley Solar Project | 250 MW | 13 km |
| Sun Valley Storage | 123 MW | 13.6 km |