← Back to map

Pitts Dudik Solar

Hill County, Texas · EIA plant ID 67024 · Operator: Elawan Pitts Dudik Solar, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate50MWSummer 50 MW
Generators1in service
Net generation102GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202723.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202329.640.8%—
2024106.524.4%—
2025101.723.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PTSDKSolar PhotovoltaicPV49.649.6Nov 2023Operating—coming soon

Owner / operator

Operator: Elawan Pitts Dudik Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Elawan Pitts Dudik Solar, LLC100.0%50 MW

Nearby plants

Within 80 km.
Pitts Dudik Solar II30 MW0.4 km
Hubbard Wind II305 MW9.6 km
Payne Battlecreek Solar—12.2 km
Ash Creek BESS—13.4 km
Sun Valley Solar Project250 MW13.5 km
Hubbard Wind300 MW13.9 km