Darden IV SolarPlanned

Fresno County, California · EIA plant ID 69664 · Operator: IPX Power USA, LLC
SolarCAISOBA: CISO

646 MW planned (Batteries, Solar Photovoltaic), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IPD4BBatteriesBA303.7287.5planned Mar 2028Planned—coming soon
IPD4SSolar PhotovoltaicPV342.7287.5planned Mar 2028Planned—coming soon

Owner / operator

Operator: IPX Power USA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Darden II Solar—3.5 km
Darden III Solar—4 km
Darden I Solar—5.2 km
San Joaquin Solar21 MW7.7 km
Van der Hoek Solar Array/ Dairy2 MW9 km
Five Points Solar Park60 MW9.7 km