Deep Space SolarPlanned
Kiowa County, Colorado · EIA plant ID 69643 · Operator: Deep Space Solar LLC
300 MW planned (Solar Photovoltaic), first expected Dec 2030 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 60215 | Solar Photovoltaic | PV | 300 | 300 | planned Dec 2030 | Planned | — | coming soon |
Owner / operator
Operator: Deep Space Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Las Animas | 6 MW | 38 km |
| Fort Lyon Solar | — | 38.1 km |
| La Junta Solar | — | 45.5 km |
| NSE Camber BH CSG 2, LLC | 2 MW | 45.6 km |
| La Junta | retired | 51.4 km |
| BH CSG 3 | 2 MW | 53 km |