← Back to map

BH CSG 3

Otero County, Colorado · EIA plant ID 68941 · Operator: Pivot Energy
SolarSolar PhotovoltaicBA: WACM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor30%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20242025202630.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20244.131.2%—
2025430.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BHC3Solar PhotovoltaicPV1.51.5May 2023Operating—coming soon

Owner / operator

Operator: Pivot Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pivot Energy100.0%2 MW

Nearby plants

Within 80 km.
La Juntaretired2.6 km
La Junta Solar—7.6 km
Rocky Ford10 MW14.1 km
NSE Camber BH CSG 2, LLC2 MW29.2 km
Las Animas6 MW32.8 km
Fort Lyon Solar—40.3 km