Cambridge Solar
Washington County, New York · EIA plant ID 69571 · Operator: Generate Capital
Nameplate5MWSummer 5 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 3.6 | 14.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 11126 | Solar Photovoltaic | PV | 5 | 5 | Jun 2025 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate Community Solar IX, LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Center Falls | 1 MW | 7.2 km |
| Middle Falls Hydro | 2 MW | 12.4 km |
| Greenwich Solar 1, LLC CSG | 5 MW | 12.8 km |
| Dahowa Hydro | 11 MW | 13.4 km |
| Schuylerville | 2 MW | 16.9 km |
| Fort Miller Hydroelectric Facility | 5 MW | 19.3 km |