← Back to map

Greenwich Solar 1, LLC CSG

Washington County, New York · EIA plant ID 63411 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicNYISOBA: NYIS
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202614.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202000.0%—
20218.218.7%—
20228.419.2%—
20237.316.8%—
20244.610.4%—
20256.514.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RTE40Solar PhotovoltaicPV55Dec 2020Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%5 MW

Nearby plants

Within 80 km.
Middle Falls Hydro2 MW2.4 km
Dahowa Hydro11 MW2.8 km
Schuylerville2 MW4.5 km
Center Falls1 MW6.3 km
Fort Miller Hydroelectric Facility5 MW10.1 km
NY8 - Darby Solar20 MW12.4 km