Hastings Generating FacilityPlanned
Barry County, Michigan · EIA plant ID 69385 · Operator: NAPS - Hastings LLC
2 MW planned (Landfill Gas), first expected Apr 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 1.6 | 1.6 | planned Apr 2027 | Planned | — | coming soon |
Owner / operator
Operator: NAPS - Hastings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Tupper Lake Wind | — | 21.1 km |
| Chatham | 7 MW | 28.8 km |
| Cascade Dam | 2 MW | 30.5 km |
| Bryon Center | 5 MW | 32.8 km |
| Ada Dam | 1 MW | 34 km |
| Ada Cogeneration LP | 33 MW | 35.5 km |