← Back to map

Powerline Energy StorageUnder construction

Citrus County, Florida · EIA plant ID 69356 · Operator: Duke Energy Florida, Inc
BatteryBA: FPC

100 MW under construction (Batteries), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 100 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PWLNBBatteriesBA100100planned Mar 2027Under construction—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bay Trail Solar Power Plant75 MW6.5 km
Crystal River3,449 MW7.8 km
Hernandoretired35.5 km
Jumper Creek Solar Plant75 MW42.9 km
Half Moon Solar Plant75 MW44.6 km
Rattler Solar Plant75 MW48.9 km