Honeycomb Solar and StorageUnder construction
Bee County, Texas · EIA plant ID 69351 · Operator: Honeycomb Solar Holdco, LLC
151 MW under construction (Batteries, Solar Photovoltaic), first expected Nov 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 151 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| HNYBS | Batteries | BA | 76.5 | 76.5 | planned Nov 2026 | Under construction | — | coming soon |
| HNYPV | Solar Photovoltaic | PV | 74.8 | 74.8 | planned Nov 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Honeycomb Solar Holdco, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Tynan | 10 MW | 0.1 km |
| Bird Dog Energy Storage | — | 9.3 km |
| Abeja Solar Farm | — | 13.4 km |
| El Algodon Alto Wind Farm, LLC | 200 MW | 21.5 km |
| Blackjack Creek Wind Farm | 240 MW | 24.5 km |
| Myers Solar and Storage | — | 26.9 km |