Honeycomb Solar and StorageUnder construction

Bee County, Texas · EIA plant ID 69351 · Operator: Honeycomb Solar Holdco, LLC
BatteryERCOTBA: ERCO

151 MW under construction (Batteries, Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 151 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HNYBSBatteriesBA76.576.5planned Nov 2026Under construction—coming soon
HNYPVSolar PhotovoltaicPV74.874.8planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Honeycomb Solar Holdco, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Tynan10 MW0.1 km
Bird Dog Energy Storage—9.3 km
Abeja Solar Farm—13.4 km
El Algodon Alto Wind Farm, LLC200 MW21.5 km
Blackjack Creek Wind Farm240 MW24.5 km
Myers Solar and Storage—26.9 km