← Back to map

Bird Dog Energy StorageUnder construction

San Patricio County, Texas · EIA plant ID 68495 · Operator: VESI 37 LLC
BatteryERCOTBA: ERCO

60 MW under construction (Batteries), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 60 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BDOG1BatteriesBA6060planned Dec 2026Under construction—coming soon

Owner / operator

Operator: VESI 37 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Tynan10 MW9.2 km
Honeycomb Solar and Storage—9.3 km
Abeja Solar Farm—14.6 km
El Algodon Alto Wind Farm, LLC200 MW21.8 km
Orange Grove131 MW29.1 km
Brightside51 MW30.4 km