Waterton Solar IUnder construction

Douglas County, Colorado · EIA plant ID 69293 · Operator: Public Service Co of Colorado
SolarBA: PSCO

4 MW under construction (Solar Photovoltaic), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 4 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WTS1Solar PhotovoltaicPV44planned Mar 2027Under construction—coming soon

Owner / operator

Operator: Public Service Co of Colorado. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Waterton Solar II—0 km
Foothills Hydro Plant3 MW4.6 km
Strontia Springs Hydro Plant1 MW8.9 km
Arapahoe Combustion Turbine Project194 MW19.7 km
Hillcrest Pump Station2 MW20.7 km
Mtn. Solar 4 (CSG)2 MW25.6 km