Natural gasNatural Gas Fired Combined CycleBA: PSCO
Nameplate194MWSummer 123 MW
Generators3in service
Net generation387GWh12 mo to Aug 2026
Capacity factor36%gas/coal/oil units, summer MW
Heat rate8,875Btu/kWhfossil units, electric fuel, HHV
First online2000Runs as intermediate

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2005201020152020202536.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
8,0008,5009,000200520102015202020258,875 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200195.7——
2002107.8——
200329527.5%8,319
2004155.214.4%9,146
2005231.321.6%8,831
2006190.717.8%8,588
2007269.825.1%8,585
2008266.924.8%8,744
2009302.728.2%8,708
2010190.317.7%8,772
2011178.816.7%8,867
201289.68.3%8,895
201321.52.0%8,855
201419318.0%9,077
2015118.311.0%9,201
201659.35.5%9,343
2017184.217.2%9,229
2018250.623.4%8,985
2019208.419.4%9,007
2020207.719.3%9,273
2021202.918.9%9,064
202222621.1%9,217
2023219.120.4%9,082
2024249.423.2%9,115
2025310.428.9%9,021

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UN5Natural Gas Fired Combined CycleCT71.139May 2000Operating—coming soon
UN6Natural Gas Fired Combined CycleCT71.139May 2000Operating—coming soon
UN7Natural Gas Fired Combined CycleCA51.844.5Oct 2002Operating—coming soon

Owner / operator

Operator: SWG Arapahoe, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SWG Arapahoe, LLC100.0%194 MW

Nearby plants

Within 80 km.
Hillcrest Pump Station2 MW8.1 km
Mtn. Solar 4 (CSG)2 MW11.5 km
Cherokee1,006 MW15.7 km
Metro Wastewater Reclamation District15 MW15.9 km
TruStile Doors - Denver1 MW17.6 km
Waterton Solar I—19.7 km