Cunningham Solar I & BESS

Lea County, New Mexico · EIA plant ID 69258 · Operator: Southwestern Public Service Co
SolarBatteriesSolar PhotovoltaicSPPBA: SWPP
Nameplate108MWSummer 108 MW
Generators2in service
Net generation103GWh12 mo to Aug 2026
Capacity factor40%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2026202739.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CHCBBatteriesBA3636Apr 2026Operating—coming soon
CHCS1Solar PhotovoltaicPV7272Apr 2026Operating—coming soon

Owner / operator

Operator: Southwestern Public Service Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southwestern Public Service Co100.0%108 MW

Nearby plants

Within 80 km.
Cunningham Solar II—1.3 km
Hobbs Generating Station682 MW6.8 km
Cunningham444 MW8.1 km
AC Ranch I—8.3 km
AC Ranch II—8.3 km
Maddox212 MW8.5 km