← Back to map

AC Ranch IUnder construction

Lea County, New Mexico · EIA plant ID 68578 · Operator: Lydian Energy
SolarSPPBA: SWPP

75 MW under construction (Solar Photovoltaic), first expected May 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AC1SSolar PhotovoltaicPV7575planned May 2027Under construction—coming soon

Owner / operator

Operator: Lydian Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
AC Ranch II—0 km
Maddox212 MW3.2 km
Hobbs Generating Station682 MW3.3 km
SPS4 Monument10 MW6.2 km
Cunningham444 MW7.6 km
Cunningham Solar I & BESS108 MW8.3 km